Project: Rotorua Hospital
Architect: Chow Hill Architects
Contractor: Hawkins Construction
The team at CS worked closely with the architect and then construction company HAWKINS on getting the finer details right with this job by providing two site measures at different stages throughout the job to ensure accuracy. CS sent technical representatives to Rotorua to carry out the site measures, providing the construction team with faces to the names and someone to liaise with over any technical detailing.
The fitout called for many different products from the CS range including extra wide cavity sliding X-RayBarrier doors, fully automatic cavity sliders, a customised stacking door set to the reception area, and commercial cavity slider door sets throughout the fit out.
An oversized set of three stacking doors divides up the waiting room area from the reception area when required. The design called for three 1-Lite NewYorker doors to stack up against a fixed panel when fully open and then collect on each other to close. CS designed a 4-TopTrack system that required no floor guides and included anodised head and closing jambs for the doors to recess into. Clear toughened glass allows transfer of light and remains safe for patrons.
CS NewYorker
Explore the versatile CS NewYorker® pre-finished aluminum door online. Perfect for cavity, surface, hinged, or multi-track setups, it boasts captivating design.
CS X-Ray Barrier
Lead-barrier cavity sliding door solution designed for isotope areas and spaces with diagnostic x-ray equipment.
Overtaking Doors
CS OvertakingDoors have an extra-thick cavity pocket, enabling a series of doors (up to five) to stack side-by-side inside the cavity pocket. These units make great room dividers, and because the width of the pocket can be minimised, the potential size of the door opening can be maximised.
Braemar Hospital
The main reception area called for a stacking cavity solution that required 3.2m high doors, spanning a total opening of 6.5m – meeting a fixed panel at one end.
Sandringham Hospital
CS Cavity Sliders most recent addition to the Track Systems product range is the CS ElecTrack. These tracks allowed our NewYorker door leaves, glazed with switchable glass, to be used.
Rotorua Hospital
Looks like you are browsing in a different region.
Would you like to change your region?
For the best experience you should browse in the correct region
Thank you!
Your submission has been sent.